User Tools
pending_ops_dev_analysis
This is an old revision of the document!
Doc link to Ops Dev Board
If a Ticket is anyway related to a development ticket or had any development involvement should get the “Development Required label.
Any issue that has to be resolved by development work should have the resolution category of “Engineering Required”
In both cases a IDMS reference needs to be added to the ticket under Developemt Reference field.
This means the relecant ticket reports are correct some of which customer recieve or may ask for.
pending_ops_dev_analysis.1636543233.txt.gz · Last modified: 2021/11/10 11:20 by 10.5.5.89