Previous revision
support:weekly_reports [2022/11/23 15:07] 10.91.129.7support:weekly_reports [2023/11/07 14:40] (current) – [Step 1: Export Ticket Data] 10.91.120.100
Line 1: Line 1:
 ======How To Run The Weekly Report====== ======How To Run The Weekly Report======
  
-[[https://docs.google.com/spreadsheets/d/186BrS2NY5WUuUw4KPCBDcC6HBnSiPEY8HNulssWAeQ8/edit#gid=862854989| Weekly Report ]]+[[https://docs.google.com/spreadsheets/d/186BrS2NY5WUuUw4KPCBDcC6HBnSiPEY8HNulssWAeQ8/edit#gid=495005261| Weekly Report ]]
  
 +
 + 
  
 ===== Step 1: Export Ticket Data ===== ===== Step 1: Export Ticket Data =====
Line 12: Line 14:
 __**Internal Tickets (Jira)**__ __**Internal Tickets (Jira)**__
  
-Bookmark this Jira filter+Bookmark this Jira filter. Export it with the "filter fields" option
  
 [[https://errigal.atlassian.net/issues/?filter=18199|Weekly Report All Internal Tickets ( 2 weeks of Resolved/Closed)]] [[https://errigal.atlassian.net/issues/?filter=18199|Weekly Report All Internal Tickets ( 2 weeks of Resolved/Closed)]]
Line 19: Line 21:
 ===== Step 2: Update The Ticket Files ===== ===== Step 2: Update The Ticket Files =====
  
-[[https://drive.google.com/drive/u/0/folders/1R_EqMTBgzt4kEx-TStLpCx2KmvXDWZAi|Ticket Files Folder]]+[[https://drive.google.com/drive/u/0/folders/1R_EqMTBgzt4kEx-TStLpCx2KmvXDWZAi|Ticket Files Folder and How to docs]]
  
-Select Yes to the prompt when the google sheet opens. This will clear the previous weeks tickets. 
-  
- 
-===== Step 3: Run Report ===== 
   * Update the 2 Ticket google sheets located in the Ticket File folder with the data from their corresponding report.   * Update the 2 Ticket google sheets located in the Ticket File folder with the data from their corresponding report.
  
-  * Each Sheet will autorun a Macro that will clear the sheet of last week's data, select yes when prompted. +  * Each Sheet will autorun a Macro that will clear the sheet of last week's data, you must select yes when prompted as this will also date stamp the sheet
  
-  * Paste in data from the report into cell A1 ensuring that all columns with hash symbols are adjusted so data is visible. +  * Paste in data from the report into cell A1. Before pasting make sure that all columns with hash symbols are adjusted so data is visible. 
- + 
-  * Open the Weekly Report Google Sheet. ( Important to only open report at this point ) +
- +
-  * The report will do some initial checks and you will then get options to run.  +
- +
-  * Wait for the report to finish.  +
- +
-  * The Report will send itself automatically. +
- +
-===== Step 4: Update ExteNet Slides ===== +
- +
- +
-On the ExteNet [[https://docs.google.com/presentation/d/1PEf3wyZ4UwoZGpr-49fBpDXWxu_lx9Hl10xhq0X7njc/edit#slide=id.p4|slides]] go to slides number 11,12,13,14  and select “Update” wherever you see it.  +
- +
-Check the Awaiting Response slide, this will have the labels in the first column updated based on the contents of the latest update field.  +
- +
-If the "ExteNet to verify / Push to production" & "Information requested" labels need to be changed then return to the weekly report and unhide the ExteNet AWR sheet. +
- +
-  * Add a number 1 to the Filter column for any ticket that is awaiting ExteNet to verify something. +
- +
-  * Add a number 2 to the Filter column for any ticket that is awaiting information from ExteNet. +
  
-  * Select “Sort”.+The report is set on a schedule and will run itself between 1pm and 2pm, if I can't run for some reason an email will be sent to support@errigal.com 
  
-Go back to the slide and update. 
  
-Inform Anthony that the slides are updated.  